Promo 1Promo 2

Boston Castle - Euro Style Set F (Gray & Midnight)

SKU
WBS-A0006
Out of stock
Compact medieval castle-themed playground with conical tower, battlements, bridge walkway, climbing wall, and open slides in a fortress-inspired design.
Size: 6.68m × 4.88m
Boston Castle Euro Style Outdoor Playground Structure — Set F (Gray & Midnight)
Compact, characterful, and instantly captivating, the Boston Castle Euro Style Set F distils the drama of a medieval fortress into a beautifully proportioned play structure perfectly suited to smaller outdoor spaces. Dominated by a tall conical tower with battlements and a flag, and flanked by a castle gate arch entryway, open yellow slides, a climbing wall, and a connecting bridge with railings, this structure delivers 10 engaging play activities for children aged 3 and above within an efficient footprint of 6.68 m × 4.88 m.
Built with powder-coated steel posts and durable UV-resistant plastic castle-themed panels in deep gray and midnight with bright yellow slide accents, the structure is designed for lasting commercial outdoor performance. The prominent tower silhouette and detailed crenellated rooflines give this compact structure a commanding visual presence well beyond its size.
This playground is ideal for:

Smaller public parks and neighbourhood playgrounds
Boutique hotel and resort play areas
Residential compound and condominium playgrounds
Preschools and primary school outdoor spaces with limited area
Retail and shopping centre play corners with a heritage theme

Key Features

Age range: 3 years and above
10 play activities included
Maximum platform height: 1.8 m | Overall structure height: 6.08 m
Footprint: 6.68 m × 4.88 m
Conical flag tower, castle gate arch, battlements, open slides, climbing wall, and connecting bridge
Deep gray and midnight with bright yellow accent colour scheme
Powder-coated steel with UV-resistant castle-themed plastic components
Smooth, rounded edges and secured fixtures for child safety
Brings the magic of a medieval castle to compact play environments
Customisable colour and configuration options available

Safety & Certification
This product is manufactured in accordance with internationally recognised safety standards, including:

EN1176 (European playground safety standard)
ASTM standards for playground equipment
EN71 (non-toxic, child-safe materials)
ISO9001 (quality management system)

✔ Certification documents and third-party test reports (such as SGS / TÜV) are available upon request from the manufacturer.
Only registered users can write reviews. Please Sign in or create an account