Promo 1Promo 2

Boston Castle - Mini Set A (Gray & Midnight)

SKU
WBS-AT0001
Out of stock
A grand castle-themed playground featuring turret towers, bridges, crawl tunnels, slides, and medieval decorative details. Designed to create an exciting multi-zone adventure experience for children.
Dimensions: 5.98m × 5.09m
Outdoor Castle-Themed Playground Complex – Kingdom Quest Series (5.98m x 5.09m)
Rule the playground with this magnificent castle-themed outdoor complex spanning 5.98m x 5.09m. Dominated by a soaring spired turret tower, castle battlements, arched gateways, and a ground-level crawl tunnel, this grand structure transforms any outdoor space into a royal kingdom. Shield and crest decorative panels, a curved open-rail bridge, a fish-scale crawl tunnel accessory, and a slide complete the adventure-filled layout — offering children a rich, multi-zone play experience steeped in medieval fantasy.
This playground is ideal for:

Public parks and large recreational areas
Themed entertainment spaces, resorts, and attractions
Schools and community playgrounds
Family entertainment centers and shopping malls

Key Features

Durable UV-resistant materials built for outdoor use
Smooth, rounded edges for enhanced child safety
Dramatic spired turret tower as the centerpiece
Castle battlements, arched gateways, and crest panel details
Ground-level crawl-through tunnel for physical exploration
Fish-scale decorative crawl tunnel accessory
Curved open-rail bridge connecting play towers
Slide for active physical play
Large footprint supporting extensive group play
Customizable colors, layout, and configurations
Easy maintenance and cleaning

Dimensions: 5.98m (L) x 5.09m (W)
Safety & Certification
This product is manufactured in accordance with internationally recognized safety standards, including:

EN1176 (European playground safety standard)
ASTM standards for playground equipment
EN71 (non-toxic, child-safe materials)
ISO9001 (quality management system)

✔ Certification documents and third-party test reports (such as SGS / TÜV) are available upon request from the manufacturer.
Only registered users can write reviews. Please Sign in or create an account