Promo 1Promo 2

Boston Castle - Physical Activity Set G (Brown & Tan)

SKU
WBS35CS-0007-111113
Out of stock
Compact linear castle-themed playground with conical tower, connecting walkways, open slide, and climbing ladder in a storybook-inspired design.
Size: 11.05m × 3.06m
Boston Castle Physical Activity Outdoor Playground Structure — Set G (Brown & Tan)
Elegant in its simplicity and charming in its detail, the Boston Castle Physical Activity Set G offers a refined, compact castle-themed play experience ideal for spaces where a smaller, premium-quality installation is desired. Finished in warm brown and tan with a decorative pine tree accent and a red flag crowning the tower, this structure features a conical castle tower, connecting platform walkways, an open slide, and a climbing ladder — delivering 8 play activities for children aged 3 and above across a slender footprint of 11.05 m × 3.06 m.
Built with durable powder-coated galvanised steel posts and UV-resistant plastic castle-themed panels, the structure maintains a consistent and high-quality visual character throughout. Its linear layout makes it an ideal fit along pathways, garden edges, or within landscaped play environments where a narrow but long footprint is available.
This playground is ideal for:

Boutique hotel and resort garden play areas
Heritage parks and storybook-themed garden spaces
Preschool and early childhood centre outdoor areas
Smaller residential compound and estate playgrounds
Retail and family entertainment spaces with heritage or fairytale themes

Key Features

Age range: 3 years and above
8 play activities included
Maximum platform height: 1.8 m | Overall structure height: 5.62 m
Footprint: 11.05 m × 3.06 m
Conical castle tower with red flag, connecting platform walkways, open slide, and climbing ladder
Warm brown and tan castle colour scheme with decorative pine tree element
Powder-coated galvanised steel with UV-resistant plastic castle-themed components
Smooth, rounded edges for child safety
Brings storybook castle charm to compact and linear play spaces
Customisable colour and configuration options available

Safety & Certification
This product is manufactured in accordance with internationally recognised safety standards, including:

EN1176 (European playground safety standard)
ASTM standards for playground equipment
EN71 (non-toxic, child-safe materials)
ISO9001 (quality management system)

✔ Certification documents and third-party test reports (such as SGS / TÜV) are available upon request from the manufacturer.
Only registered users can write reviews. Please Sign in or create an account