Promo 1Promo 2

Boston Corsair - Euro Style Set E (Brown & Blue

SKU
WBS-B0005
Out of stock
Compact pirate playground with ship panels, climbing blocks, slide, and navigation-themed features for interactive play.
Size: 10.61m × 4.17m
Boston Corsair Euro Style Outdoor Playground Structure — Set E (Brown & Blue)
Compact, evocative, and packed with nautical character, the Boston Corsair Euro Style Set E brings the spirit of a pirate galleon to a neatly proportioned outdoor play structure ideal for smaller spaces. Featuring detailed ship hull panels with porthole windows, a map and compass navigation panel, blue gem-shaped climbing blocks, a staircase gangway, and an open slide — all in warm weathered brown and deep blue — this structure offers 13 play activities for children aged 3 and above within an efficient footprint of 10.61 m × 4.17 m.
Built with durable powder-coated steel posts and UV-resistant plastic ship-themed panels, the structure delivers a genuinely immersive pirate experience without requiring the footprint of a large-scale installation. The low platform height and contained deck layout make it accessible and safe for younger adventurers while remaining characterful and engaging for older children.
This playground is ideal for:

Smaller public parks and neighbourhood play areas
Preschools and primary school outdoor play spaces
Coastal and waterfront recreational areas
Boutique hotel and resort beachfront family zones
Shopping centres and retail play corners with a nautical theme

Key Features

Age range: 3 years and above
13 play activities included
Maximum platform height: 0.9 m | Overall structure height: 4.3 m
Footprint: 10.61 m × 4.17 m
Ship hull panels with porthole windows, navigation map panel, gem climbing blocks, staircase gangway, and open slide
Weathered brown and deep blue pirate corsair colour scheme
Powder-coated steel with UV-resistant ship-themed plastic panels
Smooth, rounded edges for child safety
Brings pirate-themed imaginative play to compact outdoor environments
Customisable colour and configuration options available

Safety & Certification
This product is manufactured in accordance with internationally recognised safety standards, including:

EN1176 (European playground safety standard)
ASTM standards for playground equipment
EN71 (non-toxic, child-safe materials)
ISO9001 (quality management system)

✔ Certification documents and third-party test reports (such as SGS / TÜV) are available upon request from the manufacturer.
Only registered users can write reviews. Please Sign in or create an account