Promo 1Promo 2

Boston Corsair - Euro Style Set G (Brown & Blue)

SKU
WBS-B0007
Out of stock
Mid-scale pirate playground with cabin tower, climbing wall, crawl tunnel, and slide for engaging physical and imaginative play.
Size: 10.47m × 5.04m
Boston Corsair Euro Style Outdoor Playground Structure — Set G (Brown & Blue)
Set sail for adventure with the Boston Corsair Euro Style Set G — a charming and richly detailed pirate ship-themed outdoor playground that brings nautical storytelling and active play together in a beautifully balanced mid-scale structure. Featuring a ship's cabin tower with pitched roof, blue ocean wave panels, a giraffe periscope lookout detail, crawl tunnel porthole, a star-pattern climbing wall, and an open slide — all presented in warm wood-effect brown and deep ocean blue — this structure delivers 14 play activities for children aged 3 and above across a footprint of 10.47 m × 5.04 m.
Built with powder-coated galvanised steel posts and durable UV-resistant plastic components, the ship-themed body panels and decorative ocean wave elements are crafted to maintain their colour and detail over extended outdoor use. The combination of imaginative theming and physical challenge makes this a highly engaging destination for young adventurers.
This playground is ideal for:

Coastal parks and marine or pirate-themed recreational precincts
Preschools and primary school outdoor adventure play areas
Hotel and resort beachfront family play zones
Mid-scale residential compound and estate playgrounds
Family entertainment centres with nautical or adventure themes

Key Features

Age range: 3 years and above
14 play activities included
Maximum platform height: 1.2 m | Overall structure height: 4.07 m
Footprint: 10.47 m × 5.04 m
Ship cabin tower, ocean wave panels, periscope lookout, crawl tunnel porthole, climbing wall, and open slide
Weathered brown and ocean blue pirate corsair colour scheme
Powder-coated galvanised steel with UV-resistant ship-themed plastic panels
Smooth, rounded edges for child safety
Sparks pirate-themed imaginative and physical play
Customisable colour and configuration options available

Safety & Certification
This product is manufactured in accordance with internationally recognised safety standards, including:

EN1176 (European playground safety standard)
ASTM standards for playground equipment
EN71 (non-toxic, child-safe materials)
ISO9001 (quality management system)

✔ Certification documents and third-party test reports (such as SGS / TÜV) are available upon request from the manufacturer.
Only registered users can write reviews. Please Sign in or create an account