Promo 1Promo 2

Boston Corsair - Physical Activity Set D (Brown & Tan)

SKU
WBS35PS-0004-111113
Out of stock
Large pirate ship playground with bow and stern sections, cannon tube, slide, and activity panels for immersive adventure play.
Size: 10.39m × 5.29m
Boston Corsair Physical Activity Outdoor Playground Structure — Set D (Brown & Tan)
Sweeping, detailed, and instantly captivating, the Boston Corsair Physical Activity Set D is a premium large-format pirate ship-themed outdoor playground that stretches across a wide footprint to create a fully immersive nautical play world. Presented in warm brown and tan with red pennant flags flying from multiple masts, this expansive structure features a full ship bow section, an enclosed cannon tube, a multi-bay ship body with porthole windows, compass and medallion decorative panels, an open slide, staircase gangway access, and a ship stern section — delivering 20 play activities for children aged 3 and above across a striking footprint of 10.39 m × 5.29 m.
Built with powder-coated galvanised steel posts and durable UV-resistant plastic ship-themed cladding, this structure is engineered for the highest levels of commercial outdoor performance. The full bow-to-stern ship layout creates an unmatched sense of narrative immersion, turning every play session into a voyage of discovery.
This playground is ideal for:

Large public parks and pirate or nautical-themed recreational precincts
Coastal parks and beachside family entertainment zones
Primary school campuses with large outdoor adventure areas
Large residential township and compound playgrounds
Theme parks and destination family entertainment facilities

Key Features

Age range: 3 years and above
20 play activities included
Maximum platform height: 1.5 m | Overall structure height: 4.6 m
Footprint: 10.39 m × 5.29 m
Full ship bow and stern sections, cannon tube, porthole windows, compass and medallion panels, open slide, and staircase gangway
Warm brown and tan with red pennant flags — full pirate ship colour scheme
Powder-coated galvanised steel with UV-resistant ship-themed plastic cladding
Smooth, rounded edges and secured fixtures for child safety
Creates a complete bow-to-stern pirate ship play voyage experience
Customisable colours and configurations available

Safety & Certification
This product is manufactured in accordance with internationally recognised safety standards, including:

EN1176 (European playground safety standard)
ASTM standards for playground equipment
EN71 (non-toxic, child-safe materials)
ISO9001 (quality management system)

✔ Certification documents and third-party test reports (such as SGS / TÜV) are available upon request from the manufacturer.
Only registered users can write reviews. Please Sign in or create an account