Promo 1Promo 2

Boston Corsair - Physical Activity Set F (Brown & Tan)

SKU
WBS35PS-0006-111113
Out of stock
Compact pirate-themed playground with ship cabin tower, activity panels, climbing elements, and slide for fun outdoor play.
Size: 6.03m
Boston Corsair Physical Activity Outdoor Playground Structure — Set F (Brown & Tan)
Compact but full of swashbuckling character, the Boston Corsair Physical Activity Set F is a delightfully detailed pirate-themed outdoor playground that brings the excitement of a harbour-side adventure to smaller play spaces. Featuring a ship's cabin tower with a red pennant flag and tall mast, a decorative palm tree, a target activity panel, a porthole crawl element, anchor decorative details, and a staircase entry — all presented in warm brown, tan, and silver-gray — this charming structure delivers 8 play activities for children aged 3 and above within a neat footprint of 6.03 m.
Constructed with powder-coated steel posts and UV-resistant plastic ship-themed panels, the structure is built for lasting outdoor performance. Its compact and approachable scale makes it an excellent standalone feature or complement within a larger themed play precinct, bringing the Boston Corsair series' signature nautical character to sites where space is at a premium.
This playground is ideal for:

Smaller public parks and coastal or harbour-side recreational areas
Preschools and early childhood centre outdoor play spaces
Boutique hotel and resort beachfront family zones
Smaller residential compound and condominium playgrounds
Shopping centres and retail play corners with a pirate or nautical theme

Key Features

Age range: 3 years and above
8 play activities included
Maximum platform height: 0.9 m | Overall structure height: 4.3 m
Footprint: 6.03 m
Ship cabin tower with mast and flag, palm tree, target panel, porthole crawl, anchor detail, and staircase entry
Warm brown, tan, and silver-gray pirate harbour colour scheme
Powder-coated steel with UV-resistant ship-themed plastic panels
Smooth, rounded edges for child safety
Brings compact pirate-themed character to smaller outdoor spaces
Customisable colour and configuration options available

Safety & Certification
This product is manufactured in accordance with internationally recognised safety standards, including:

EN1176 (European playground safety standard)
ASTM standards for playground equipment
EN71 (non-toxic, child-safe materials)
ISO9001 (quality management system)

✔ Certification documents and third-party test reports (such as SGS / TÜV) are available upon request from the manufacturer.
Only registered users can write reviews. Please Sign in or create an account