Promo 1Promo 2

Boston Treehouse - Physical Activity Set B (Brown & Tan)

SKU
WBS35TH-0002-111113
Out of stock
Multi-tower treehouse-themed playground with slides, tunnel crawl, rope climbing, bridges, and interactive nature activity panels in a spacious woodland-inspired design.
Size: 10.05m × 8.16m
Boston Treehouse Physical Activity Outdoor Playground Structure — Set B (Brown & Tan)
Warm, inviting, and brimming with natural character, the Boston Treehouse Physical Activity Set B is a generous multi-tower outdoor play structure that captures the magic of a woodland retreat in a richly detailed, earthy design. Finished in warm brown and tan with palm tree canopy accents and decorative nature-themed activity panels, this expansive structure features multiple themed towers with pitched canopy roofs, an enclosed tube slide, an open slide, a connecting tunnel crawl, rope climbing elements, and interactive panels — delivering 20 play activities for children aged 3 and above across a footprint of 10.05 m × 8.16 m.
Constructed with powder-coated galvanised steel posts and high-quality UV-resistant plastic components, every element is crafted to evoke the warmth and texture of a natural treehouse environment while withstanding the rigours of heavy commercial outdoor use. The wide variety of activities and multi-tower layout ensures this structure engages children across a broad range of ages and physical abilities.
This playground is ideal for:

Public parks and nature or eco-themed recreational precincts
Primary school campuses with spacious outdoor areas
Large residential township and compound playgrounds
Family entertainment centres with nature themes
Hotel and resort garden and outdoor family play zones

Key Features

Age range: 3 years and above
20 play activities included
Maximum platform height: 2.4 m | Overall structure height: 5.22 m
Footprint: 10.05 m × 8.16 m
Multi-tower layout with pitched canopy roofs, enclosed tube slide, open slide, tunnel crawl, rope climbing, and activity panels
Warm brown and tan treehouse colour scheme with palm tree canopy accents
Powder-coated galvanised steel with UV-resistant plastic components
Smooth, rounded edges for child safety
Encourages imaginative, nature-themed, and physical play for a wide age range
Customisable colours and configurations available

Safety & Certification
This product is manufactured in accordance with internationally recognised safety standards, including:

EN1176 (European playground safety standard)
ASTM standards for playground equipment
EN71 (non-toxic, child-safe materials)
ISO9001 (quality management system)

✔ Certification documents and third-party test reports (such as SGS / TÜV) are available upon request from the manufacturer.
Only registered users can write reviews. Please Sign in or create an account