Promo 1Promo 2

Boston Treehouse - Physical Activity Set G (Brown & Tan)

SKU
WBS35TH-0007-111113
Out of stock
Immersive treehouse-themed outdoor playground featuring slides, bridges, tunnels, climbing frames and interactive panels designed for continuous nature play experiences.
Size: 13.38m × 5.48m
Boston Treehouse Physical Activity Outdoor Playground Structure — Set G (Brown & Tan)
Expansive, lush, and full of discovery, the Boston Treehouse Physical Activity Set G is a wide-spanning outdoor playground that creates a fully immersive nature play environment across a generous footprint. Presented in warm brown and tan with green palm tree canopy towers, leaf-form decorative elements, and detailed nature-themed activity panels, this multi-section structure features an enclosed tube slide, open slides, a connecting tunnel crawl, climbing frames, walkway bridges, and numerous interactive panel elements — delivering 17 play activities for children aged 3 and above across 13.38 m × 5.48 m.
Engineered for commercial outdoor performance, the structure is built with powder-coated galvanised steel posts and high-quality UV-resistant plastic components. The wide, linear layout makes it ideal for parks and recreational spaces where a long, immersive play corridor can be created, drawing children through a series of connected play environments from one end to the other.
This playground is ideal for:

Large public parks and nature-themed recreational precincts
Primary school campuses with wide outdoor play areas
Large residential township and compound playgrounds
Hotel and resort landscaped garden play zones
Family entertainment centres with jungle or forest themes

Key Features

Age range: 3 years and above
17 play activities included
Maximum platform height: 1.8 m | Overall structure height: 4.61 m
Footprint: 13.38 m × 5.48 m
Enclosed tube slide, open slides, tunnel crawl, climbing frames, bridges, and interactive nature panels
Warm brown and tan treehouse colour scheme with green palm canopy towers and leaf decorative elements
Powder-coated galvanised steel with UV-resistant plastic components
Smooth, rounded edges for child safety
Creates an immersive nature play corridor experience
Customisable colours and configurations available

Safety & Certification
This product is manufactured in accordance with internationally recognised safety standards, including:

EN1176 (European playground safety standard)
ASTM standards for playground equipment
EN71 (non-toxic, child-safe materials)
ISO9001 (quality management system)

✔ Certification documents and third-party test reports (such as SGS / TÜV) are available upon request from the manufacturer.
Only registered users can write reviews. Please Sign in or create an account